What it actually treats
Ownership reality
Routine
Backwash periodically to prevent packing and reclassify the bed. Replenish sacrificial calcite media as it dissolves while correcting low pH.
Major
Published replacement / media life: Sacrificial calcite media; periodic replenishment required
Acid Neutralizer: valve/electronics 5 years, tank 10 years; neutralizing media is a consumable and is not warranted.
HALO's Acid Neutralizer warranty lists 5 years on the valve/electronics and 10 years on the tank. The neutralizing media is consumable and is not covered as a warranted long-life component; replenishment is part of normal ownership.
Published service flow is Media specification: 6 GPM per cubic foot; exact installed system flow depends on media volume/configuration; high simultaneous household demand may require a higher-flow configuration.
WaterScore 72/100 is a calibrated review index. Underlying Research Index: 64/100. The fixed whole-home reference of 84 research points maps to 95; zero remains zero, and the remaining range maps to 100. Treatment facts, evidence credit and missing-data limitations are unchanged. This is not percent contaminant removal, a certification or a safety probability. Scoring methodology.
Where it is made
Origin varies by product. HALO ION 2.0 Plus is explicitly 100% Made in USA; other exact models should be verified separately.
Origin varies by product. HALO ION 2.0 Plus is explicitly 100% Made in USA; other exact models should be verified separately.
What it actually costs
Dealer quote
Equipment pricing is provided by a local dealer after selecting and sizing the system. Listed by F.W. Webb / HALO dealer. Checked 2026-10-05. Source: https://www.fwwebb.com/product/Halo/Water-Filtration-System/H-AN-100/1253862
Think about your mechanical room
Before your plumber orders it, confirm:
- Main-line size and connection diameter
- Available service flow and incoming pressure
- Drain requirement / backwash routing
- Electrical outlet or UV/controller power
- Tank/cartridge replacement clearance
- Bypass and isolation valves
- Pressure gauges before/after restrictive stages
- Floor drain / leak protection where appropriate

